Mike, Tuska, Chris W. and John. Mike and Tuska breaking up boulders and winching out for a few hours, about 6ft lower again. Bedding type roof heading towards Wookey direction at about 45°, the opposite way there is a draughting hole in the floor. Cement work done at the end with Chris and John popped over to say “Hello”. Mike.
To watch the diggers in action on YouTube click here
Sunday, 6 March 2022
Friday, 4 March 2022
Friday 4th March 2022
John Cooper and Dave Morrison. Some clatch moved to surface so
Kushy can Plug and Feather more boulders. 1 hour. John.
Saturday, 12 February 2022
Saturday 12th February 2022
Wednesday, 2 February 2022
Wednesday 2nd February 2022
John Cooper and David Morrison (Tuska). Tuska organised delivery
of the winch and ladder which he started fettling in the morning. I turned up
about 1.30pm with some water as there was none for mixing cement. Spent a while
deciding where and how to fix the entrance ladder. Left it propped on rocks
pending a proper base being constructed Sunday. Finally spent some time cutting
off welded on nuts from the winch frame. 2 hours for me. John.
Wednesday, 26 January 2022
Wednesday 26th January 2022
John Cooper and David Morrison (Tuska). Tuska on the surface
mixing with John below cementing boulders to prop up the entrance pipes. Not
quite so muddy today. 2 hours. John.