Wednesday, 6 August 2025

Wednesday 6th August 2025

Day. Mike Kushy and Dave Morrison spent 5 hours doing more tidying up on the surface.

17.30 Ed Ford and Hollie London. Ed and Hollie entered around 17.30 after collecting bags from the Belfry. Hollie carried in two bags each containing a Daren Drum of sand, while Ed carried a  black BDH of cement, a Daren Drum of sand and a 5L water container in. Quite the challenge with two large tackle sacks. John arrived shortly after.

18.00  John Cooper entered at 18.00 without any loads to carry! John did 1 mix (2 Daren Drums of sand and half a black BDH of cement) which he passed down to Ed. Then did another mix, same quantities, and used it higher up on the climb down (where the yellow bag is). John then left with bag containing 2 empty Daren Drums - out by 20.30.

Ed and Hollie  worked mainly around the entrance to the new bit. Hollie did a good job at reducing a large block making it much easier to get into the breakthrough (her first time plug and feathering). Ed spent his time adding cement to various loose boulders and made a small wall. We didn't get as far as the squeeze. But Ed took a look. It's definitely tighter than remembered. This will take a fair amount of drilling to widen. Spare bags, empty cement BDH and drill box taken out. Out at 2100 before retreating to the Hunters'. 

Ed, Hollie and John.

Trainee mason in action. Photo EF.

Drilling 14mm holes. Photo EF.

Building block created. Photo EF.

Looking down into pot. Photo EF.

Sunday, 27 July 2025

Sunday 27th July 2025

AM - Mike Kushy, David, Louise and Jackson Morrison. 

MK and DM continued with building the well whilst LM and JM filled the trailer with unusable rocks. After a while LM and JM went off for a walk. Pretty much done and ready for earth to be backfilled around the well and landscape the ground. Mike.

Entrance photos by DM.




PM - Sam Hill and Mike Kushy
 
Met Kushy and Tuska at the dig at 3pm and had a quick chinwag whilst admiring their handywork on the entrance. Kushy and myself then set off underground armed with the drill box and a drum of sand and a BDH of ready mixed cement between us. Once at the dig I made my way down and through the new stuff with Kushy staying up in the safe (ish) area. Once in TP chamber Kushy and myself got the light connection through the better looking approach to the chamber and I had a look around, marvelling at the new stuff. Kushy cleared the topside of this whilst I came back up and then he grabbed the drill box. With the large crowbar I went down to the lower side of this and pulled down what I could. One very large oven sized boulder came down and then took two more similar sized ones with it as is crashed down the chamber with a extremely loud racket which Kushy wasn't expecting. Having got what I could from the bottom I tried from the top but everything was too loose and unpredictable so a retreat was made up through the very snug squeeze into the horizontal stuff. I then joined Kushy as he was bringing down the second batch of cement to stabilise the way through the boulders. A very impressive find with a lot of stabilising work to be done. 2hrs for both of us. Sam.

Looking horizontally Eastwards. Photo SH.
 The dig through to Tea Party Chamber is down to the right.