Sam Hill and Trevor Hughes. SH underground at 1815. Started clearing larger rocks from the bang debris. Then filled 6 bags and started shifting everything up until Trevor arrived. He then drilled 2 holes into the slab by the new connection point. Bags then emptied and all rocks moved to chamber above 10ft. A lot of loose stuff in the end to get out but will need a bigger team. Definitely worth enlarging the connection first to make clearing easier. Out by 2100. Sam.
I only drilled two holes (to the absolute full length of the 400mm drill bit): this should suffice to destroy the slab blocking the connection, especially if lengthened to 600mm; I don’t think it’s an area that you want to hit too hard so I would suggest 20g is used. The two holes are about 450mm apart so only 1 m of 5g will be needed. There is a huge amount of small spoil at the dig face that will be easy enough to shift once this connection is opened. There was also a really arse wetting stream flowing last night but in a way this is a good sign. Trevor.
 |
Dig Face. Photo SH.
|
 |
Dig Face. Photo SH.
|
 |
Proposed connection. Photo SH.
|