Mike K, Tuska, Alan Mills and Mark Helmore. Cementing and stabilising the shaft again, a dozen loads put in. The shaft is now cemented all 360° all around the edge and tied in 2-3ft. deep all around. PF’d a boulder directly down and looking at a 6ft. drop down. Mike.
To watch the diggers in action on YouTube click here
Sunday, 23 January 2022
Tuesday, 18 January 2022
Tuesday 18th January 2022
John Cooper and Mike Kousiounis. Cool overcast but dry and no
wind. Mike was working at the bottom cementing boulders to prop up the entrance
pipe. John was on the surface mixing cement. Two bags of slab mix and two bags
of sand. To each bag was added half a bag of ballast and some cement. The four
mixes were split in half to lower down to Mike. Half a dozen small loads of mud
were hauled out. Very muddy underfoot on surface. 2 hours. John.