Mike Kushy, solo. Took in a bag of postcrete, bung with tap attachment and hose. Dismantled some of the dam and built it back up using the postcrete. Once this was finished I went to the dig face with some empty buckets to grab some sticky mud and give the postcrete time to set. Big puddle at the bottom! (Glad I didn't struggle bringing the drill in). The sticky mud was used to line the dam inside and out. Once this was done I fitted the bung into the pipe work and attached the hose. Need to render the dam up with cement ideally at some stage as there are still a couple of minor leaks. The hose was really effective and a good flow came out, enough that the dam doesn't fill up quick enough, to provide a constant flow. I've left the tap open and managed to put the hose into the boulders to the left. Turned the tap off for a while and then opened again. The water can be heard flowing off down the hose and into the diversion. Recommend leaving the tap open open when not there, then closing on arrival of digging trips ready to use for cleaning or flushing afterwards. 2 hours. Mike.
Youtube channel.
|
The finished dam. Photo MK.
|
|
Puddle. Photo MK.
|
|
Puddle again. Photo MK.
|
No comments:
Post a Comment