Sunday, 11 February 2024

Sunday 11th February 2024

Mike Kushy, David Morrison (Tuska) and John Cooper. Started with MK at the dig face breaking up rocks and filling up behind retaining wall with clatch, DM was on surface wall building. MK around 1pm being overwhelmed with rocks brought a load up to the base of the shaft. JC had just arrived and a dozen buckets were sent up to surface. MK then went back to the dig face to use up the rest of the batteries breaking up rock. The face of the very large rock came off but there is still alot more to demolish. Cement had been mixed and JC joined MK down the bottom for cement work. The retaining wall was raised further (nearly to the ceiling, but still a gap to tip buckets into). JC also cemented some more stuff higher up, there is still a small hole at the step down that clatch can be poured into. JC came down to inspect the bottom and work was done stabilising the walls at the very bottom. Some clearing out of the floor and this will need to be continued building upon next time. Strong outward draught today from new hole in the floor. Lots of fossils and some coral around. 4 1/2 hours for me. Mike.

MK's YouTube Video from today

Haven't had a photo of the surface for a while. Photo MK

The bottom after clearing, obvious big block still in place to downsize further. Photo MK.

No comments:

Post a Comment