Tuesday, 4 April 2023

Tuesday 4th April 2023

Mike Kushy, solo trip. A cold draught could be felt from the first climb down after Pocket Watch.  Went to Tooth Dig and moved the rocks back from the small chamber before the corner to the bottom of the climb, then moved forward and moved the stuff from the corner back into the small chamber. Then moved forward again and broke up some more rock in the floor and cleared any loose stuff out of the tunnel back to the corner. Removed some large blocks from the floor going into the undercut and made smaller then sent back to the corner. Filled up 6 small buckets of sand and mud. Draught was stronger from straight ahead today. Dug a little along the strike line and found more sopping red mud, there's a round hole in the ceiling all clean washed with water dripping out of it, must be where the worms came from? The ceiling has lots of phreatic remnant and seems to be rising up. Finished off by moving some stuff in the corner back to the smaller chamber, lots of clearing back up cave to do but mainly good sized rock so won't take too long. 3 1/2 hours. Mike. 


The entrance to the tunnel, before starting work

Along the tunnel from the undercut

Looking into the undercut

A closer view


No comments:

Post a Comment