Saturday 22 April 2023

Saturday 22nd April 2023

Mike Kushy and Mike Wise. Took 2 drills in. Cleared the backlog of spoil at the corner up to the dumping ground and took all the empty buckets forward. MW worked on making the squeeze over the slab more comfortable whilst MK set to work on the boulders at the end of the tunnel. One very large boulder was dropped from ahead and broken down, then an even larger block was moved into a better position to be broken up next time. I reckon with this one removed we have just a metre to get to the solid wall ahead. MW down sized some of the boulders moved back into the alcove from the last session. Lots of smaller rocks were moved to the corner and 2 small buckets filled. 3 1/2 hours. Mike K.

No comments:

Post a Comment