John Cooper. Chopping out the bits sticking out near the top of
the shaft. The intention is to get a straight haul of spoil from the bottom.
Might need a bit of cement before more is removed. 1½ hours. John.
John Cooper. Chopping out the bits sticking out near the top of
the shaft. The intention is to get a straight haul of spoil from the bottom.
Might need a bit of cement before more is removed. 1½ hours. John.
John Cooper and Mike Kousiounis (Kushy). Mike worked on the entrance for 3 hours in the morning before being joined by John after his Swildon’s Hole trip. Afternoon session was mixing cement then sending it down to Mike along with loads of building rock. 6 hours (Mike) and 3 hours (John). John.
John Cooper, Mike Kousiounis (Kushy) +1. Mike +1 did some work on the entrance for a couple of hours in the
morning, assisted for the last few minutes by John before a lunch break was
taken. All 3 then back for a 3 hour session in the afternoon. Lots of cementing
of supporting walls in the entrance shaft. More still to do before straightening
out the shaft begins. Very hot sunny day with alot of stone taken from the spoil heap for walling & infil. 5 hours. John.