John Cooper, Dave Morrison and Andrew Thompson (and Wayne stopped
by for a visit). Widening the bottom by John using plug and feathers. Also some
clatch removed. Depth measured at 26¼ ft (must do it myself next time in
metres!). 2½ hours. John.
John Cooper, Dave Morrison and Andrew Thompson (and Wayne stopped
by for a visit). Widening the bottom by John using plug and feathers. Also some
clatch removed. Depth measured at 26¼ ft (must do it myself next time in
metres!). 2½ hours. John.
John Cooper, Mark Helmore, Dave Morrison, Andrew Thompson and Chris
Williams. Took across another large water container. Plug and feathers used to
break up a couple of boulders into bits small enough to haul out. Also removed
a load of muddy clatch. Some work done on surface repositioning haul line.
Draught coming outwards today. 2 hours. John.
John Cooper and Andy Thompson went across early afternoon and
assisted Kushy, Mark Helmore and Al Mills for a bit of rock hauling. Tuska had
already left. Empty water container brought back to Upper Pitts for refilling.
1 hour. John.