Wednesday, 19 March 2025

Wednesday March 19th 2025

Mike W and Mike K, having discussed the matter a couple of times recently, decided to go and disturb the floor in Cement Dig. Mike K arrived first and went ahead, bag in hand, to check the results of a recent disturbance in Puddle Dig and rollup and retrieve the wire; Mike W followed carrying a drill bag and battery box. The two Mikes met at the connection point into Boulder Rift chamber and soon were reminiscing about previous visits to the 'old cave'. Mike W inserted himself into the bottom of the dig and found there wasn't room to swing a drill, so it was decided to open things up by making the two steps disappear. 4 holes were drilled in the bottom step and 2 in the upper step. Although some quickly holed through at 300mm, others were drilled normally to between 400 and 600 mm. Mike K busied himself dropping dried mud down Mike W's neck and into the drilled holes. After some faffing around, the job was done and Mike K laid a wire trail all the way back to Golden Key Chamber. He fired just as Mike W was hauling bags up the 10ft climb. 3 hours  Mike W

A disturbed but still quite wet Puddle dig. Photo MK.

Mike W sitting on the lower step in Cement Dig. Photo MK.

Wednesday, 12 March 2025

Wednesday 12th March 2025

Mike Kushy and Mike Wise. MK went in early and cleared some mud. Pool still there. MW arrived and 4 holes drilled, 3m used. 2 1/2 hours. Mike K.

Dig face. Photo MK.