To watch the diggers in action on YouTube click here
Tuesday, 31 October 2023
Tuesday 31st October 2023
John Cooper. First of all wiggled a boulder out which was then
plug and feathered to manageable chunks. Then drilled some holes in the bottom
and sides, 4 in the floor and 6 in the walls. All 10 holes 300 – 500mm deep
ready for Mike on Sunday. 2 hours.John.
Sunday, 29 October 2023
Sunday 29th October 2023
Mike Kushy, Dave Morrisom and John Cooper. Mike and Dave clearing out bang spoil. Some of the charge didn't go off for some reason, never mind though as the blocks we want to bang had shifted from the charge that did go off allowing removal. Cleared enough ready for drilling. John joined us at the end. Good draught. 2 1/2 hours. Mike.
![]() |
Looking into the chamber at the bottom, all seems to be holding up okay. Photo MK. |
![]() |
The bottom after clearing. Red block wiggles and will come out. Blue
crosses supposed drilling point. Yellow crosses maybe to be drilled,
would be good to get out. Photo MK. |
Subscribe to:
Posts (Atom)