Friday, 30 August 2024

Friday 30th August 2024

Mike Kushy. Cementing.

Arrived about 10.30. Mixed up and took 2 heavy buckets of cement to the dig face. Used this on the right hand, fractured wall. Then got back to surface about 1.15pm and set to making another 2 buckets of mix. JC arrived just as I had lowered the buckets, he kindly cleaned up the tools whilst I went back down. Used one bucket ahead and the other bucket building steps and losing rocks in gaps. Got to surface about 3pm. Too tired to drill or run cable. 4 1/2 hours. MK.

A royal welcome to the dig this morning . Photo MK.

Thursday, 29 August 2024

Thursday 29th August 2024

Mike Kushy. Went in at 4pm. Retrieved bang wire and stated clearing debris. Bit fumey in the boulder chamber, but below this the air was okay. Bang did just as needed. Cleared back as much as possible and broke up the easy to pick rock. Lots of cement work to be done before attacking the next boulder ahead. A view beyond this boulder shows the floor dropping away more steeply. A cross section where fault and bedding passage meet ahead and what looks to be a significant hole at the bottom. Draught present, but not obvious. 3 hours. MK

MK's YouTube video from today

Bang debris. Photo MK.

After clearing. Photo MK.