John Cooper. One mix of cement taken in, 2 buckets, and made a
start on supporting the boulder on the right-hand side. Will need lots more as
well as the wall on the left-hand side. 2 hours. John.
To watch the diggers in action on YouTube click here
Tuesday, 6 August 2024
Tuesday 6th August 2024
Saturday, 3 August 2024
Saturday 3rd August 2024
Mike Kushy and Trevor Hughes.
MK got the the cave about 10.45. A large boulder had fallen out from the bang, this was downsized and moved up cave. The bang had done alot of damage. Cleared the face a bit and Trevot arrived about 13.30. We filled bags with small clatch and found holes around to lose a lot of loose stuff into. TH had a go at the front, breaking up loose rock and crowbarring what he could safely. The end is going to need some stabilising before another bang, mainly the big sloping boulder on the right needs trapping in place. It would be nice not to have this one move as it's a lot of rock to deal with. Some rocks stacked around as walls, a good load at the bottom of the awkward climb to send higher up. Finished at 16.30. Mike.
![]() |
Before clearing. Photo MK. |
![]() |
During clearing. Photo MK. |
![]() |
After. Photo MK. |