Saturday, 20 January 2024

Saturday 20th January 2024

Mike Kushy and Dave Morrison to start with. DM surface and MK down cave. MK broke up and moved rocks from the last session to the bottom of the shaft where DM hauled them to the surface. After 20 minutes or so Sam Hill and Callum Simmonds came to join us. With MK at the bottom of the shaft, SH at the step down and CS at the dig face (breaking up boulders) we cleared for a while. MK then went to the lower rift area and filled small buckets with clatch, a small line of rope with karabiner is now in place and helped with pulling the smaller buckets up. All the rift and the continuing bedding is fully cleared, can now be surveyed. CS continued breaking and moving boulders from the pit, then left around 1ish. SH then worked the pit and MK transferred waste from the step. DM left around 1.30pm after a non-stop hauling session. Around 2ish Alex Randall came to join us. MK in the pit  with AR on the step and SH on surface. SH took point for a while with MK on the step and AR on surface. Many buckets were cleared until 4pm ish. At the dig face it is now possible to look up cave (towards Swildon's way) for several metres. A solid floor can be seen dipping down towards the pit. In the pit a view over some large boulders gives sight to the clean washed solid floor that looks to be headed off towards proper cave! Unfortunately the gaps between boulders are not large enough to squeeze through. I propose a few short holes with some 20g to shape the boulders and get us into the next area. If anything collapses we will just have to deal with it. Great draught getting sucked into the 'proper cave passage'. 5 hours.  Mike.

MK's YouTube Video from today

Sam.Hill sat in the pit. Photo MK.

Obstructive boulders with proposed drill holes. photo MK.

Can look over and down to see what looks like solid floor. Photo MK.

View over the boulders, red area looks like potential cave passage. Photo MK.

Sunday, 14 January 2024

Sunday 14th January 2024

Mike Kushy and Dave Morrison to start with. A big cementing session with 3 bags worth of sand, building up to the ceiling and propping natural pillars. DM left around 1.30 and John.Cooper arrived not long after. JC helped with the final cement buckets. After all cementing done MK worked on widening the bedding wall of the rift where we propose to dig down next. Should be safe to move/break boulders in the floor now. Unusual draught, air from outside being dragged into the dig, hitting the bedding passage which draughted outwards, then the draught got dragged into a void in the floor. 5 hours. Mike.

MK's YouTube Video from today

Draught cycle. Photo MK.

After plug and feathering and cementing. Photo MK.

Looking into the rift, under where we've cemented
(the top void is sucking away all the drill dust). Photo MK.