John Cooper, Rob Harper, Al Mills and Dave Morrison (Tuska). Surface
levelling work all day. Attempt to erect cover showed up weakness in design.
Back to the drawing board. 7 hours. john.
John Cooper. Continued breaking up rock. Took in a couple of short
bits of scaffold tube which will be used in building a roof over the ongoing
tunnel. 1½ hours. John.