Friday, 17 October 2025

Friday 17th October 2025

Hollie London, Harley Bennett

HL and HB headed down WR at 1630 to assess the damage from the previous bang. The new ladder made an excellent addition to the entrance series and new tape definitely highlights where you need to go navigationally. HB highlighted the bacon as we entered the bedding chamber, something we would normally charge past on the way to the dig face. After stopping to photograph the bacon, we continued down to the up and over boulder. The bang has successfully doubled the body space above the boulder, with the bottom half remaining intact. The pot before the boulder looks to have opened up and was drafting well. Due to lack of man power and everything being lose, we decided not to clear and retreated having photographed the damage. On exit, one plank fell off the wooden lid down the  entrance and needs a repair job to screw down. HL made a short term fix until the weekend so nothing can fall down. Hollie.

New base section. Photo HL.

Formations in Lower Badding Chamber. Photo HL.

Needs clearing. Photo HL.