Tuesday, 25 March 2025

Tuesday 25th March

Mike W and Sam H to assess the damage made in Cement Dig from last weeks activity, move out what material we could and assess possibilities for next steps.

The steps had disappeared, creating some much needed space and there was a lot of mixed sized debris in the bottom. A hole up on the right, not visible from the steps was disgorging stones, mud and clay at random with quite a lot already on the floor. Further space creation opportunities exist on the right at floor level. Cement work was largely intact.

With Sam in the hole and Mike perched above, 4 buckets of small stuff and all the accessible medium, large and larger but manageable rocks were brought up and dumped on the only flat surface available (where the end of the wire had been left). Sam uncovered two very large rocks which could be moved but not lifted out.

Actions needed in the normal course of events would be a) cement up the loose hole b) P&F the large rocks and lift them out and c) get a team of at least 5 to move the rocks back to a suitable spot and then chain out all the small stuff in buckets. While discussing this we started getting terminally depressed at the thought of how much cement would be needed to be brought down to accomplish the first task. We instead discussed the use of lightweight, but strong GRP grid, brought down in suitably sized sections and either bolted into place or wedged behind steel tubing or dexion. This has been successfuly used in LVS to create a working platform and hold back the loose overhead boulder choke. Suitably installed, possibly with chicken wire behind it, this could also enable storage of much of the small and medium sized debris, avoiding the painful thought of chaining it out. The hole needs gardening and surveying to establish details of course, but we left feeling much more cheerful following this discussion. We just need to find some off-cuts.

Time underground 1 hour. Write up by Mike W / Photos by Sam.

Photos.  1 before clearance /  2 and 3 after clearance / 4 Puddle dig, still very wet




Wednesday, 19 March 2025

Wednesday March 19th 2025

Mike W and Mike K, having discussed the matter a couple of times recently, decided to go and disturb the floor in Cement Dig. Mike K arrived first and went ahead, bag in hand, to check the results of a recent disturbance in Puddle Dig and rollup and retrieve the wire; Mike W followed carrying a drill bag and battery box. The two Mikes met at the connection point into Boulder Rift chamber and soon were reminiscing about previous visits to the 'old cave'. Mike W inserted himself into the bottom of the dig and found there wasn't room to swing a drill, so it was decided to open things up by making the two steps disappear. 4 holes were drilled in the bottom step and 2 in the upper step. Although some quickly holed through at 300mm, others were drilled normally to between 400 and 600 mm. Mike K busied himself dropping dried mud down Mike W's neck and into the drilled holes. After some faffing around, the job was done and Mike K laid a wire trail all the way back to Golden Key Chamber. He fired just as Mike W was hauling bags up the 10ft climb. 3 hours  Mike W

A disturbed but still quite wet Puddle dig. Photo MK.

Mike W sitting on the lower step in Cement Dig. Photo MK.

Wednesday, 12 March 2025

Wednesday 12th March 2025

Mike Kushy and Mike Wise. MK went in early and cleared some mud. Pool still there. MW arrived and 4 holes drilled, 3m used. 2 1/2 hours. Mike K.

Dig face. Photo MK.